RSA - Risk Spares Analyzer

To optimize inventory
To ensure parts availability

One of the biggest challenges facing globalization is development of maintenance strategy to meet corporate goals while at same time reducing production costs. Optimizing the resources that are dedicated to plant maintenance is a significant and manageable segment of production costs. Inventory reduction leads to production down-time risk and over-stocking leads to excessive inventory value. Reduction can be achieved by implementing scientific inventory analysis techniques, which enables a consistent risk based approach to highlight appropriate inventory levels.

Risk is characterized as the product of probability of a given failure event and the consequences of that event. Spare part failure is an event and consequences can be measured in terms of lost production time, physical damages or causalities. Based on equipment failure scenario and probability, spare parts of extreme and high critical equipment will be subjected to the analysis in Risk Spares Analyzer (RSA) to determine the parts availability. Here ‘parts availability’ shall mean the quantity of spare part that should be made available on demand, to the maintenance end-user over a specified period, in order to achieve the risk coverage level (service level).

Features

RSA is driven by the method of consequence analysis due to events. RSA calculates the part availability for a specified period, using failure risk formula considering the following parameters.

  • Risk, i.e., probability of failure based on equipment / component failure rate
  • Time period - lead-time or annualized
  • Equipment or item criticality scores
  • Parts per change-out

The tool provides lead-time and annualized part availability. The lead-time part availability of the stock items along with safety levels shall be considered as minimum stocking level. The annualized part availability shall be considered for forecasted yearly value analysis.

RSA is a user-friendly analysis tool, developed in MS-Access.

Objective

  • To determine the part availability of critical equipment spares
  • To cover the stock-out risk for parts of unpredictable demand
  • To improve service levels

Conclusion

The results obtained by this analysis can be utilized by the Maintenance team to relax on the assured part availability and the Materials department to set optimum stock levels. In this age of global competition, modern maintenance strategies aimed at lowering production costs without adverse environmental, safety and health impacts are critical. Assuring spare parts availability plays a vital role in achieving this goal (Risk coverage).