ACHIEVEMENTS
Successful "Updation & Upgrading Maintenance data
for SAP R/3 Compliance" at QATAR PETROLEUM, QATAR
Qatar Petroleum Project
Introduction
Qatar Petroleum (previously
known as Qatar Gas & Petroleum Corporation) was
established in 1974, as a national corporation completely
owned by the State of Qatar. Qatar Petroleum is responsible
for all oil and gas industry processes in Qatar and
abroad, including exploration and drilling for oil,
natural gas and other Hydrocarbon substances, production,
refining, transport and storage of the aforementioned
substances and any of their derivatives and by-products,
as well as trading in, distribution, sale and export
of these substances
Qatar Petroleum was
using TEROMAN Computerized Maintenance Management System
software (CMMS) to provide equipment information and
work management requirements to the Maintenance and
Production departments of Qatar Petroleum Facilities
namely NGL plants Mesaieed, Cathodic Protection Stations
and Gas Distribution Station in & around Doha.
Proposed Project Requirement
Qatar Petroleum procured
SAP R/3 4.6c version and required all its data to be
converted for SAP Compliant. This assignment required
reviewing the existing database and eliminating duplication,
obsolete equipment & related spares and adding additional
equipment.
Hofincons has developed
Maintenance Asset Register, Developing Maintenance Strategy
by using leading edge techniques, populating the Interim
Database (IDB) for the equipment. This involved adding
new data and updating for eventual uploading it into
SAP.
Hofincons consultant
reviewed existing database, eliminate duplication &
obsolete equipment, adding additional equipment. Hofincons
is also identifying the requirement for developing Maintenance
Asset register.
Project Plan
The project involved
development of Maintenance Strategy by using leading
edge techniques & software tools such as IDEF0,
HighBuild, Criticality Software, RCM, RBI, and RSA etc.
Establishing Asset Management Plan, Developing and Asset
register or Master Tag List. Hofincons consultants updated
present plant & engineering drawings and provide
training to Qatar Petroleum engineers.
Hofincons conducted the Gap Analysis
followed by.
- Hierarchy Build,
- Strategic Maintenance,
- Creation of Work Specifications
was carried out.
- Data Transfer procedure for data
to be transferred & uploaded to SAP.
- Develop Quality Plan.
- Update Drawings, Plots, AutoCAD
files.
- Asset verification methods.
Project Deliverables
- Strategic Audit
- Business Improvement Plan
- Functional & Equipment Criticality
Analysis.
- Creation of work specification
& routines that are SAP compliant.
- Developing Maintenance schedule,
shutdown work specification,
- Spares identification and carry
out Risk Spares Analysis.
- Document Collection, Data review,
maintenance strategy formation,
- Data collection,
- Updating all maintenance related
data and drawings,
- Data Transfer and Data QA / QC
review and final document with cleaned data.
- Asset verification.
- Documentation Updates.
- Updating Maps, Projects List,
- Equipment Hierarchy.
- Functional & Equipment Criticality
Analysis.
- Maintenance Optimisation. Materials
– Spare Parts,
- Shutdown Services,
- Strategic Audit. Asset Management
Plan.
- Software tools used for best practices
and provide training to client engineers.
Project Benefits
Data clean up and data
being converted SAP compliant for the SAP system to
be effective and it is ON LINE from the date one of
system take off. Indeed, it will help QP for KPI’s
monitoring for better performance, reliability and availability
etc. can be analyzed systematically.
This project
leads to success of Functional implementation of SAP
system, hence the overall business operation will improve.
Only the data will drive the system successfully, which
will have guidelines of KPI’s for better operations
performance.
|